A modern summer resident almost daily faces a number of problems arising on his own plot. Pest control, fertilizer seedlings, care for them and watering - a symbiosis that represents the daily picture of the summer resident. However, the most significant and destructive problem is excessive wetting of the site. This seemingly insignificant problem in reality predetermines the existence of problems with the overall yield of the plot. Fortunately, gardeners are not alone in this problem, and our article will fully explain what are the most effective methods of drying the site from groundwater.
- Excessive wetting of the site, what to do
- What is a drainage system, types of structures and their features
- Surface drainage
- Deep drainage
- How to make a surface drainage with your own hands
- How to drain the cottage with deep drainage
- DIY drainage, the easiest way
Excessive wetting of the site, what to do
Excess water on the land plot can create a lot of problems, the main among which is the deterioration of germination of vegetables and fruits and the beginning of their rotting. In order to save your own summer cottage from inevitable problems, of course, it is necessary to take urgent measures, making a choice in favor of a particular method of drainage.
- Assistance of a qualified team. As with any other problem, excessive wetting of the area may be decided by specialized experts, having a specialized fixture. They certainly know how to properly drain the dacha, but, as a rule, professionals simply pump out water with pumps - the effect is momentary, but not durable.
- Sand application to the soil. The method consists in sanding the soil, i.e. its uniform mixing with sand in equal proportions. This method not only solves the problem, but also significantly improves the quality of the land, increasing its yield. The problem of the technique is the need for a large amount of sand and labor-intensive work.
- Creating a drainage. The installation of the drainage system is the creation of special ditches throughout the site, their further integration and the final drainage of water. The method is highly efficient, affordable and cost-effective.Moreover, to date, the experience of summer residents, which consists in how to make drainage, can be freely studied and made with your own hands. Due to various reasons and peculiarities, experts strongly recommend choosing this way to solve the problem with excess moisture.
- Open ditches. The system of removal of excess water from the site is solved by creating (digging) open ditches at a slight angle. Thus, water stagnating at the site enters the drainage ditches and is discharged into the common drain hole or outside the territory of the site. A significant drawback of such ditches is their rapid shedding and pollution - efficiency is observed only in the first weeks.
- Planting trees. Separate trees, such as willow and birch, for example, help significantly to clean marshlands. Trees, due to own water consumption, effectively dry the area. However, drying the site with the help of trees is a long-term process, which is not always possible for a summer resident. Moreover, trees create an extra shadow in the summer cottage, which is also undesirable in conditions of limited cottage sizes.
- Bulk soil and bed level raising. The solution to the problem in this case lies exclusively in the purchase of soil and raising the total land level in the dacha. This option is certainly effective, but expensive and time-consuming, which in real conditions does not allow to consider it as the main one.
What is a drainage system, types of structures and their features
Drainage cottages - one of the most important components of the created engineering communications on the site. It helps the groundwater, rainwater and melt water not to linger on the site and, accordingly, prevents waterlogging. In fact, there are many ways to clean the area from water, but the following types of drainage have proven themselves best:
- Surface drainage (open type);
- Deep drainage (closed type).
Surface drainage
Surface drainage at the dacha represents a network of open channels, the diverting and receiving areas of which are performed at a certain angle that prevents the shedding of the soil. This method of protection against excess moisture on the territory of the summer cottage is perfectly suited for removing water from tracks, drains, roofs and canopies. Regarding groundwater, surface drainage at the dacha is effective only in the case of large quantities and high levels, since water is collected exclusively on the surface of the ground.
On the constructive side The greatest efficiency of surface drainage is observed with a ditch width of at least 30-40 cm and an inclination angle of the side walls of at least 30 degrees, which ensures normal water collection from the site. Surface drainage exists point and linear. The first is intended for local collection of water at selected drain points. The point surface drainage joins the drainage drainage channels, i.e., the linear drainage. The point drainage of the suburban area, as a rule, is a kind of drain hole, with the help of which in the future water is removed from the area.
The device of such holes is incredibly simple, and their effectiveness is ensured only by sufficient dimensions and proper organization of the collection and removal of water.The elements of linear surface drainage are represented by ditches and channels evenly located in the areas of the greatest accumulation of groundwater and other waters. In fact, linear and point surface drainage is best used together.
Deep drainage
Based on the name, it becomes clear that A distinctive feature of deep drainage is the location underground. Such a system, as well as surface drainage, is intended to divert groundwater and rainwater from the dacha. This type of drainage usually, is selected on the basis of the geographical location of the problem. Thus, the closed type of water drainage is most appropriate in lowlands and places with naturally elevated levels of soil moisture.
In view of the design features, it is advisable to divide the deep drainage into:
- Horizontal;
- Vertical;
- Combined.
Combined design - a combination of horizontal and vertical drainage types. Using a combination is also not always advisable. As the main channels, pipes with holes previously made in them are used to absorb water. The depth of such channels is about 40-50 cm.
How to make a surface drainage with your own hands
The surface drainage of the summer cottage with your own hands can be done quite simply, while ensuring the high efficiency of the activities carried out. Immediately it is worth noting that This method is the most economical and simple. As mentioned earlier, surface drainage includes a combination of linear and point drainage systems. Thus, in the process of creating an open drainage of the dacha, it is necessary to install storm water inlets, drainage systems, protective elements and dig ditches.
The most universal type of open drainage is a linear system that provides an adequate level of comprehensive protection. This design is simple and does not require special skills. The basis of the implementation of this method is the proper preparation of a plan for the dacha plot - it should reflect all the buildings, trees, and, of course, the places where rain and groundwater are the most collected. On this basis, further it is necessary to note the path of diversion of water into the drain hole or beyond the territory of the site.
Making a similar plan, remember: water should be discharged in the direction of the slope. In addition, in order to minimize the used area of the soil, the water diversion paths should be done along the smallest path.
Following the finished plan, you need to dig ditches with a depth and width of 30 cm (the volume of the ditch is determined independently depending on the volume of groundwater and rainwater). The side walls of the trench must be done especially carefully so that in the future there will be no shedding. All the trenches indicated on the plan, as a rule, are combined into one and brought to the pit, however, if water can be simply taken outside the territory of the site, then they can be made independent of each other.
Finished ditches or canal system should be lined with foil or tarpaulin, which will allow not to delay, but to quickly drain water. To recreate the geometry of the ditch, the film needs to be fixed with nails, pushed into the ground, or other improvised fixers. The film on the side walls, fixed from above, is additionally reinforced with wooden or metal struts, installed in width every 30-50 cm.
The last layer that needs to be filled up is loose soil, it is filled up until the level of the soil is level. This part of the drainage system is created for the rough cleaning and bulk drainage of groundwater and rainwater.
The final step is to install drainage pipes and a storm system throughout the site. Their volume is insufficient - it is for this purpose that deep drainage is organized, but they will be useful in the case when the water level will be extreme, and the surface drainage of the suburban area will not fully cope. In this way, surface drainage will completely solve the problem of rainwater and groundwater drainage; moreover, it will be efficient, cheap and fast.
How to drain the cottage with deep drainage
In some cases, surface drainage does not solve the problem, due to the large volume and proximity of groundwater. Then it is advisable to create a drainage of a closed-type dacha. Depth drainage is characterized by the ability to completely solve the problem of excessive humidity, and also maintains the appearance of the summer cottage.
The beginning of the creation of this type of drainage system also begins with the preparation of the plan and the complete drawing of the lines along which the pipes will be laid. The direction of discharge of water - in the direction of the slope. Next you need to determine the depth of their occurrence. So, in the most dense soil the depth will be no more than 50 cm, and in sandy soil - up to 1 meter.
Also consider the climatic conditions - it is very important that during the cold winter the pipes with the remains of water in them do not crack, and the freezing soil does not crush them.
Practically all gardeners and specialists choose perforated plastic pipes as drainage paths. They are cheaper, affordable and durable. In some cases, for additional protection, pipes are covered with textiles, which prevents sand from getting inside and significantly increases the service life of the entire system.
Ways of sewage and the place of their reception are prepared with special care. In the case of closed depth systems, it is advisable to dig trenches with a width of no more than 50 cm, and not to cover the side surfaces at all. Drainage of water can be organized both in the drain hole, and for the territory of the site. As in the case of an open system, it is advisable to concrete the walls of the pit, thus creating a spare water tank, which will certainly be useful to every summer resident.
After preparing all the ditches and creating a groundwater drainage system, they should be prepared for the laying of pipes. First of all, you need to create a cushioning cushion, laying sand and gravel on the bottom (10 cm each). Only after this begins laying the pipes and combining them into a single system through plastic fittings, the choice of which is varied.
The distances to the sides of the drainage are also filled with sand and rubble. On top of the laid drainage should be laid textiles that protect the perforated pipes from sand, gravel and soil. The end of the process - backfilling drainage sand (15 cm), gravel (15 cm) and soil. The embankment should be made a mound, because over time the land will settle and level with the rest of the ground. This type of drainage suburban area more costly and complex however it is different durability and high efficiency equal to which there is simply no.
DIY drainage, the easiest way
As it becomes clear from the above, drainage at the dacha can be done in many ways, while maintaining the effectiveness of measures, however, most people, of course, because of certain reasons wants to drain land quickly, cheaply and reliably. It is precisely these requirements that drainage meets at the dacha, the easiest way we can offer.
- First of all, make a complete plan of your own summer cottage, specifying the desired drainage lines to the ditch, ravine or pit. The receiving drainage pit must be at least 1 meter in height and have sides also at least a meter;
- Following the developed plan, dig ditches gradually increasing their depth. The width of the ditch should be at least 30 cm;
- Pre-prepared plastic film (can be used) cut into long strips wide, approximately equal to the size of the groove (80 cm). The resulting strips cover dug diverting ditches, including their lateral surfaces. The stability of the film on the walls is best provided with wooden struts (should be about 1 cm longer than the width of the groove), installed at a distance of about 30-40 cm from each other. It is better to lay broken brick, crushed stone, wood waste on the base of the film. In order to ensure sufficient fixation of the film in the ditch under any circumstances, the layer poured in the middle of the ditch should be a slide about 5 cm in height higher than the sides of the drainage line.
- Followed by cut wider strips of plastic film (about 10-20 cm more than the width of the previously applied film). These strips need to cover the formed hills, creating a small arch. Under these lanes will be organized free flow of water.
- The resulting drainage is filled with loose earth or sand, after which it is raked.
Due to various reasons, increased humidity in suburban areas is quite common, but, despite the seemingly problematic nature of this situation, you absolutely should not despair, because drainage of the dacha can be easily organized with your own hands having previously studied and applied the methods for draining the dacha plot described in the article.